Image may be NSFW.
Clik here to view.
ASSA ABLOY UK Specification, a UK division of ASSA ABLOY1, the physical security product company, reports that it has supplied products to major stadiums on the now iconic Queen Elizabeth Olympic Park.
The company met the criteria to supply the Stratford, east London and worked with the Olympic Delivery Authority (ODA) management and supplied security and access specifications to over six projects throughout the development. The company says that the products were ergonomically fit for purpose. Products included access control and electric locks in the main stadium, steel doorsets in the velodrome and multi-point locking in the athletes village.
David Wigglesworth, Managing Director of ASSA ABLOY UK Specification, said: All eyes were on the Park, so we felt a great responsibility to provide impressive solutions that complemented the buildings aesthetics, whilst ensuring the safe, manageable and efficient flow of high levels of traffic throughout the facility.
With six different projects within the development with various functional requirements, it was a challenge, but our large product portfolio, together with our extensive experience in supplying doorset and access control solutions to sporting arenas, was a huge benefit to its success.
It was an honour to have contributed to the development of what is now one of the most iconic sports venues in the UK, and it is great to see the legacy continue to help the local economy and community.
Visit www.assaabloy.co.uk2.
References
- ^ ASSA ABLOY (www.assaabloy.co.uk)
- ^ www.assaabloy.co.uk (www.assaabloy.co.uk)
The post Olympic Park supply appeared first on News4Security.